The client required an independent technical review of all their P91 material following the discovery of some cracking in the manufactured welds. Therefore, ETD were approached to submit a proposal with the objective of assessing the condition/ suitability of the piping system for safe start-up and long-term use.

Required work included:

  • Welding Procedure Specification (WPS) and Weld Procedure Qualification Records (WPQR);
  • Weld and parent metal microstructures (reports including microstructure images supplied by the client);
  • Mechanical test results for full section weld sample;
  • Metallographic reports on surface breaking and detected subsurface defects;
  • Fitness for Service (FFS) study reports;
  • Contractors consultant report on weld condition;
  • Extent and type of NDT carried out on completed welds.